Daytime Noise Monitoring Results - Normal weekday            
Station M7a, Wah Ming House                    
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
03-Nov-10 13:15 13:45 Sunny 62 64 60 Rock Excavation  N.A N.A 21.2 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
08-Nov-10 09:45 10:15 Sunny 73 75 68 Rock Excavation  Construction at Wah Shun House and Wah Hong House N.A 22.5 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
18-Nov-10 09:08 09:38 Sunny 63 64 60 Muck loading Construction at Wah Kei House N.A 21.6 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
24-Nov-10 13:08 13:38 Sunny 65 68 61 Muck loading and excavation Construction at Wah Kei House N.A 20.9 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
30-Nov-10 09:04 09:34 Sunny 73 75 69 Operation hand-held breakers N.A N.A 21.7 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
      Min. 62                
      Max. 73